Notice of Construction Tender for Construction of Hanchuan Expressway Maintenance Project in 2017 of Shaanxi Provincial Expressway Construction Group Co., Ltd.
1. Tender conditions
The capital for maintenance and repair of the Hanchuan Expressway in 2017 has been listed annually in the Shaanxi Provincial Expressway Construction Group Corporation's maintenance investment plan. The funds have been implemented and the tendering conditions are met. The legal person of this tendering project is Shaanxi Provincial Expressway Construction Group Co., Ltd. (hereinafter referred to as “the tendereeâ€), and the executing agency of the project is Shaanxi Baohan Expressway Construction Management Co., Ltd. Hanchuan Branch. It is proposed to publicly bid for the construction of this project and invites units with corresponding qualifications (hereinafter referred to as “biddersâ€) to participate in the bidding.
2. Project Overview and Bidding Scope
2.1 Project Overview
(1) Project location: Hanchuan Expressway (G85 Yinkun Expressway, Hanzhong City, Han County, Hantai and Nanzheng County)
The main contents of the project include: daily cleaning of main lines, ramps, connecting lines, toll stations and service areas along the line, cleaning of evaporation ponds, passages, etc.; repair of diseases such as pavement pits, cracks, etc.; tunnel door decoration and wall cleaning, dredge Tunnel vertical and horizontal drainage pipes, sand-draining wells, inspection wells; cleaning and maintenance of traffic safety facilities.
(2) The bidding project is scheduled to enter the market on May 1, 2017, and will be completed on December 31, 2017. The planned construction period is 245 calendar days, and the 300-item minor repair project has a defect liability period of 12 months.
2.2 Division of bids
A construction bid section was set up for the construction bid, and the YH-1 bid work content was a minor repair project of K304+411 to K349+000, with an estimated cost of RMB 1.4 million.
2.3 Maximum Price
The maximum price for the bidding for construction shall be set and the maximum price of the YH-1 standard shall be determined by the tenderer with the notification of the supplement letter.
3. Supervision agency setting
No supervision agency will be set up for this project, and the project implementation agency will perform the supervision duties on behalf of the project management agency.
4. Bidder qualification requirements
4.1 This qualification review requires bidders to meet the following qualifications and performance requirements and have corresponding construction capabilities in terms of personnel, equipment, and funds.
4.1.1 Qualification requirements
(1) Having Class A qualification for highway maintenance issued by Shaanxi Provincial Communications Authority;
(2) An independent legal person who has a business license and is verified to be valid;
(3) It has an enterprise safety production license and is valid for annual review;
(4) The main person in charge of the company (the company's legal representative, responsible person for corporate safety production work) holds the safety assessment certificate issued by the relevant competent authority (Level A);
4.1.2 Performance Requirements (2014-present)
Completion of not less than 2 minor repairs or maintenance works on level 1 or highways, of which at least 1 will be minor repairs and repairs to the expressway; accumulatively completed maintenance projects including minor repairs and maintenance will not be less than 5 million yuan.
4.2 The bidding for the construction is not accepted by the consortium.
4.3 Two or more legal persons that have affiliated companies with investment shares, or parent companies that have direct management and managed relationships, or whose legal representative is the same person may not bid on the same bid at the same time. If an enterprise that has the above relationship before the opening of the bid participates in the bid, its bid document will not be accepted. If the above relationship is found during the bid evaluation process, its bid documents will all be rejected.
5. Evaluation method
The construction bidding will be qualified after the trial. The qualification review method will adopt the “qualified system†and will be reviewed according to the bid section. The bid evaluation method shall adopt the reasonable and low price method.
6. Acquisition of tender documents
6.1 All qualified bidders are requested from March 16, 2017 to March 22, 2017 (excluding holidays), daily from 8:30 to 11:30, and from 14:00 to 17:00 At the time (Beijing time, the same below), purchase tender documents.
6.2 Bidding documents priced at 1,000 yuan, according to the bid purchase, overdue not for sale, after sale.
1. Tender conditions
The capital for maintenance and repair of the Hanchuan Expressway in 2017 has been listed annually in the Shaanxi Provincial Expressway Construction Group Corporation's maintenance investment plan. The funds have been implemented and the tendering conditions are met. The legal person of this tendering project is Shaanxi Provincial Expressway Construction Group Co., Ltd. (hereinafter referred to as “the tendereeâ€), and the executing agency of the project is Shaanxi Baohan Expressway Construction Management Co., Ltd. Hanchuan Branch. It is proposed to publicly bid for the construction of this project and invites units with corresponding qualifications (hereinafter referred to as “biddersâ€) to participate in the bidding.
2. Project Overview and Bidding Scope
2.1 Project Overview
(1) Project location: Hanchuan Expressway (G85 Yinkun Expressway, Hanzhong City, Han County, Hantai and Nanzheng County)
The main contents of the project include: daily cleaning of main lines, ramps, connecting lines, toll stations and service areas along the line, cleaning of evaporation ponds, passages, etc.; repair of diseases such as pavement pits, cracks, etc.; tunnel door decoration and wall cleaning, dredge Tunnel vertical and horizontal drainage pipes, sand-draining wells, inspection wells; cleaning and maintenance of traffic safety facilities.
(2) The bidding project is scheduled to enter the market on May 1, 2017, and will be completed on December 31, 2017. The planned construction period is 245 calendar days, and the 300-item minor repair project has a defect liability period of 12 months.
2.2 Division of bids
A construction bid section was set up for the construction bid, and the YH-1 bid work content was a minor repair project of K304+411 to K349+000, with an estimated cost of RMB 1.4 million.
2.3 Maximum Price
The maximum price for the bidding for construction shall be set and the maximum price of the YH-1 standard shall be determined by the tenderer with the notification of the supplement letter.
3. Supervision agency setting
No supervision agency will be set up for this project, and the project implementation agency will perform the supervision duties on behalf of the project management agency.
4. Bidder qualification requirements
4.1 This qualification review requires bidders to meet the following qualifications and performance requirements and have corresponding construction capabilities in terms of personnel, equipment, and funds.
4.1.1 Qualification requirements
(1) Having Class A qualification for highway maintenance issued by Shaanxi Provincial Communications Authority;
(2) An independent legal person who has a business license and is verified to be valid;
(3) It has an enterprise safety production license and is valid for annual review;
(4) The main person in charge of the company (the company's legal representative, responsible person for corporate safety production work) holds the safety assessment certificate issued by the relevant competent authority (Level A);
4.1.2 Performance Requirements (2014-present)
Completion of not less than 2 minor repairs or maintenance works on level 1 or highways, of which at least 1 will be minor repairs and repairs to the expressway; accumulatively completed maintenance projects including minor repairs and maintenance will not be less than 5 million yuan.
4.2 The bidding for the construction is not accepted by the consortium.
4.3 Two or more legal persons that have affiliated companies with investment shares, or parent companies that have direct management and managed relationships, or whose legal representative is the same person may not bid on the same bid at the same time. If an enterprise that has the above relationship before the opening of the bid participates in the bid, its bid document will not be accepted. If the above relationship is found during the bid evaluation process, its bid documents will all be rejected.
5. Evaluation method
The construction bidding will be qualified after the trial. The qualification review method will adopt the “qualified system†and will be reviewed according to the bid section. The bid evaluation method shall adopt the reasonable and low price method.
6. Acquisition of tender documents
6.1 All qualified bidders are requested from March 16, 2017 to March 22, 2017 (excluding holidays), daily from 8:30 to 11:30, and from 14:00 to 17:00 At the time (Beijing time, the same below), purchase tender documents.
6.2 Bidding documents priced at 1,000 yuan, according to the bid purchase, overdue not for sale, after sale.
CS-211S: 1+1 pockets coin counter and sorter,
CS-311S: 2+1 pockets coin sorter
CS-610S+PRO: 6+1 pockets coin sorter
CS-910S+: 9+1 Pockets coin sorter
Those 4 models are all with alloy sensor for counterfeit detection
CS-600B: 6+1 pockets, mainly sort coins by diameter, no counterfeit detection
Coin Sorter,Coin Sorter With Detection,Coin Sorter For Euro,Currency Sorting Machine
Suzhou Ribao Technology Co. Ltd. , https://www.ribaoeurope.com